Namibia's Environmental Impact Assessment Tracker


An independent online tool to promote transparency, public input and understanding of Namibia's EIA process.

EIA Tracker is supported by the Namibian Chamber of Environment (NCE) and the Namibian Environment and Wildlife Society (NEWS).


This site provides information about Environmental Impact Assessments (EIAs) in progress in Namibia, and is separate from the formal administration of EIAs which is done by the Ministry of Environment, Forestry and Tourism (MEFT). Comments or complaints about specific EIAs should be directed to the MEFT at https://eia.meft.gov.na/.

» Go to the "The EIA process in Namibia" page to learn more about the EIA process and how to submit your comments, concerns and other inputs.

The map below and the table underneath it show the location of EIAs. Click/tap on any cluster marker to zoom in to that area and see details. Open the Legend accordion below to see the cluster and marker legends. Zoom and pan the map, then hover on a marker to see the title of the EIA. Tap/click on a marker to see more information. Use the Map Layers icon (top right) to switch layers on and off.

Filter the map and table:

Last date for input by interested and affected parties
ECC: Environmental Clearance
Certificate
A High - C Low
Text in Project, EAP or Proponent name

The number of EIAs in an area is shown by coloured cluster markers:

xxx indicates <10 EIAs

xxx indicates 10–100 EIAs

xxx indicates >100 EIAs


The extent of an individual EIA is indicated by a shaded polygon.


Category   /   StatusEIA on holdEIA underwayECC issuedECC rejected
Agriculture
Aquaculture
Energy
Geological exploration
Industry, manufacturing
Mining
Non-urban infrastructure
Oil exploration
Sand mining
Tourism
Urban infrastructure

 


Icons from: Map Icons Collection

32 EIAs match the selected filters. See the table below the map for EIA details.

32 EIAs match the selected filters. (The numbers on the map indicate the number of sites these EIAs include; many EIAs encompass more than one location/site.)



Click/tap on any hyperlinked heading to sort the data table (ascending) by that heading; click/tap again to sort descending.
EIA # Sort descending Title Category, Status & Risk rating EAP Proponent Deadline for IAP inputs
[1358]
See full details
EIA Process for the Proposed Abstraction of Groundwater from the Kranzberg Aquifer Mining
EIA underway
B (Medium)
Environmental Compliance Consultancy (ECC) Osino Gold Exploration and Mining (Pty) Ltd
[1786]
See full details
Environmental Assessment For An Application For Environmental Clearance For The Proposed 20 MW PV Solar Park (40 Ha) And The Associated 30 Km Long 66 KV Powerline, Dundee License Area, Oshikoto Region Non-urban infrastructure
EIA underway
C (Low)
Enviro-Leap Consulting CC Masaus Investment CC
[1787]
See full details
Environmental Impact Assessment Construction Of DR3604 (Oshaango-Epembe) Access Gravel Road Okambumbu School-Okanayimbula School-Omishe School Non-urban infrastructure
EIA underway
C (Low)
Tortoise Environmental Consultants (TEC) Ministry of Works and Transport
[1788]
See full details
Environmental Impact Assessment for the subdivision of Erf 214 Klein Windhoek into 22 Erven and the Remainder. Includes rezoning specific erven for horse stables, single residential use (1:700 density), business use (bulk 1.0), private open space, and street reservation, with amendments to the Windhoek Zoning Scheme for relevant uses Urban infrastructure
EIA underway
C (Low)
Stubenrauch Planning Consultants (SPC) Grete Keding
[1790]
See full details
Environmental Impact Assessment For Mineral Exploration On EPL 9628 Geological exploration
EIA underway
B (Medium)
Impala Environmental Consulting Armasi Mining (Proprietary) Limited
[1791]
See full details
Environmental Impact Assessment For Mineral Exploration On EPL 9398 Geological exploration
EIA underway
B (Medium)
Impala Environmental Consulting Fishlab Investments CC
[1793]
See full details
Environmental Impact Assessment For The Construction Of Gravel Roads DR4172 Omagoneni - Omuhongo (24 Km) Non-urban infrastructure
EIA underway
C (Low)
Tortoise Environmental Consultants (TEC) Ministry of Works and Transport
[1794]
See full details
Environmental Impact Assessment Proposed Sand Mining (Gravel), Ohameva Village, Okongo Constituency, Ohangwena Region Non-urban infrastructure
EIA underway
C (Low)
Tortoise Environmental Consultants (TEC) Napunikwa Investment CC
[1795]
See full details
Environmental Impact Assessment For Construction Of 1000 Cattle Standing Capacity Feedlot And Related Infrastructure At Etunda, Omusati Region Non-urban infrastructure
EIA underway
C (Low)
Tortoise Environmental Consultants (TEC) Ministry of Agriculture,Water and Land Reform
[1796]
See full details
Environmental Assessment For An Application For Environmental Clearance For Mineral Exploration And Small-Scale Mining On Mining Claims 71767, Erongo Region Mining
EIA underway
B (Medium)
Enviro-Leap Consulting Ipaheua Muhenje
[1797]
See full details
Environmental Impact Assessment Proposed Upgrading Of DR 3630 Onyati - Onyuulaye - Onkumbula (70Km), From Gravel To Low Volume Seal (LVS) Standard (Tar Road) Non-urban infrastructure
EIA underway
C (Low)
Tortoise Environmental Consultants (TEC) Ministry of Works and Transport
[1799]
See full details
Lofdal Mining Project Environmental Clearance Certificate Amendment Notice of Public Review Period for the Draft Environmental Impact Assessment Mining
EIA underway
A (High)
SLR Environmental Consulting (Namibia) (Proprietary) Limited Namibia Rare Earths (Pty) Ltd
[1801]
See full details
Environmental Impact Assessment for Rezoning of Portion 402 (a portion of Portion 362) of the Consolidated Farm Okahandja No. 277 from “Undetermined” to “General Business”, Otjozondjupa Region Urban infrastructure
EIA underway
C (Low)
Stubenrauch Planning Consultants (SPC) Dirk Jakobus Tromp
[1803]
See full details
Environmental Impact Assessment For The Rezoning Of Erf 434, Outapi Extension 1 From "Single Residential" To Business With Bulk 3.0, Outapi, Omusati Region Urban infrastructure
EIA underway
C (Low)
Green Gain Environmental Consultants cc Oshana Cash and Carry cc
[1804]
See full details
Environmental Impact Assessment for the Proposed Establishment of a Retail Shopping Development in Mariental. Urban infrastructure
EIA underway
C (Low)
Matrix Consulting Services Jachri Properties (Pty) Ltd
[1806]
See full details
Environmental Impact Assessment (EIA) For Closure of Proposed Portion A of Erf 2555, Ondangwa Extension 8 as a 'Public Open Space' and Subsequent Rezoning to 'Institutional'. Urban infrastructure
EIA underway
C (Low)
Nghivelwa Planning Consultants St Silva Private Hospital
[1807]
See full details
Environmental Impact Assessment (EIA) For The Proposed Subdivision of Portion 34 of Rehoboth Town and Townlands No.302 Into 42 Portions. Urban infrastructure
EIA underway
C (Low)
Harmonic Town Planning Consultants CC The Karoo-Ochse (Central) (Pty) Ltd
[1808]
See full details
Environmental Impact Assessment For The Proposed Eploration Activities on Exclusive Prospecting Licences (EPL) 9121, 9547, 9410 and 9636 In Kunene, Karas and Otjozondjupa Regions Geological exploration
EIA underway
B (Medium)
Red Dune Environmental Consulting CC JG Investment Three Pty Ltd
[1809]
See full details
Environmental Impact Assessment (EIA) for the Proposed Construction of Access Road Upgrading to Gravel Standards of Access Road to Oikokola Clinic and School in the Omusati Region (8km). Non-urban infrastructure
EIA underway
C (Low)
Environam Consultants Trading (ECT) Ministry of Works and Transport
[1810]
See full details
Environmental Impact Assessment (EIA) For Detailed Design, Tender Documentation for the Rehabilitation and Widening of the TR2/2 Usakos - Arandis (89km) in the Erongo Region Non-urban infrastructure
EIA underway
C (Low)
Enviro Management Consultants Namibia. Roads Authority of Namibia (RA)
[1811]
See full details
Environmental Impact Assessment For The Proposed Abstraction Of Groundwater From The Kranzberg Aquifer In Usakos, Within The Erongo Region, Namibia Mining
EIA underway
B (Medium)
SLR Environmental Consulting (Namibia) (Pty) Ltd Osino Gold Exploration and Mining (Pty) Ltd
[1812]
See full details
Environmental Impact Assessment for the Proposed Exploration Activities on EPL No: 10141 in Okahandja, Otjozondjupa Region Geological exploration
EIA underway
B (Medium)
Kalahari Geological and Environmental Solutions CC Ludi Namibia Mining and Investment (Pty) Ltd
[1813]
See full details
Environmental Assessment for an application for Environmental Clearance for mineral exploration and small scale mining on Mining Claims 71767, Erongo Region Mining
EIA underway
B (Medium)
Enviro-Leap Consulting CC Ipaheua Muhenje
[1814]
See full details
Environmental Assessment For An Application For Environmental Clearance For The Proposed 20 MW PV Solar Park (40 Ha) And The Associated 30 Km Long 66 KV Powerline Oshikoto Region Energy
EIA underway
C (Low)
Enviro-Leap Consulting CC Masaus Investment cc
[1816]
See full details
Environmental Impact Assessment (EIA) for the Proposed SKM Access Gravel Road off MR 124 (C34) Road Okatumba to Otuani Village, Kunene Region, Namibia. Non-urban infrastructure
EIA underway
C (Low)
EnviroPlan Consulting Co Ministry of Works and Transport
[1817]
See full details
Environmental Impact Assessment (EIA) Study for the Proposed Construction of DR3470: Rooidag Gate (Ou-Cordorn) - Kano Vlei (74km) Gravel Road Standards in the Kavango West Region. Non-urban infrastructure
EIA underway
C (Low)
Serja Hydrogeo-Environmental Consultants CC Ministry of Works and Transport
[1819]
See full details
Environmental Impact Assessment Studies for the Proposed New MTC Sites Built (Telecommunication Network Towers) in the Kunene, Oshikoto, Ohangwena, Kavango East, and Kavango West Regions. Non-urban infrastructure
EIA underway
C (Low)
Serja Hydrogeo-Environmental Consultants CC Mobile Telecommunications Limited (MTC),
[1821]
See full details
Environmental Impact Assessment for the Rezoning of Portion 402 (a Portion of Portion 362) of the Consolidated Farm Okahandja No. 277 from 'Undetermined' to 'General Business'. Non-urban infrastructure
EIA underway
C (Low)
Stubenrauch Planning Consultants (SPC) Dirk Jakobus Tromp
[1822]
See full details
Environmental Impact Assessment for the Licensing of Boreholes, the Abstraction of Groundwater, and the Construction of Reservoirs to Supplement Water Supply for the Activities on Portion 7 of Farm Klein Okapuka No. 51, Windhoek, Khomas Region. Non-urban infrastructure
EIA underway
C (Low)
Green Earth Environmental Consultants Namib Poultry Industries (Pty) Ltd
[1824]
See full details
Environmental and Social Impact Assessment (ESIA) for the Proposed Development of the Offshore Venus Field in Block 2913B, Off the Coast of Southern Namibia. Industry or manufacturing
EIA underway
C (Low)
SLR Environmental Consulting (Namibia) (Pty) Ltd TotalEnergies EP Namibia B.V. (TEEPNA)
[1825]
See full details
Environmental Impact Assessment (EIA) Study for the Proposed Construction of DR3470: Rooidag Gate (Ou-Cordorn) - Kano Vlei (74 km) Gravel Road Standards in the Kavango West Region. Non-urban infrastructure
EIA underway
C (Low)
Serja Hydrogeo-Environmental Consultants CC Ministry of Works and Transport
[1826]
See full details
Environmental Impact Assessment for the Rezoning and Proposed Development of Portion 402, Consolidated Farm Okahandja No. 277, from "Undetermined" to "General Business" in the Otjozondjupa Region Non-urban infrastructure
EIA underway
C (Low)
Stubenrauch Planning Consultants (SPC) Dirk Jakobus Tromp