Namibia's Environmental Impact Assessment Tracker


An independent online tool to promote transparency, public input and understanding of Namibia's EIA process.

EIA Tracker is supported by the Namibian Chamber of Environment (NCE) and the Namibian Environment and Wildlife Society (NEWS).

Read more: https://conservationnamibia.com/blog/eia-tracker.php


This site provides information about Environmental Impact Assessments (EIAs) in progress in Namibia, and is separate from the formal administration of EIAs which is done by the Ministry of Environment, Forestry and Tourism (MEFT). Comments or complaints about specific EIAs should be directed to the MEFT at https://eia.meft.gov.na/.

» Go to the "The EIA process in Namibia" page to learn more about the EIA process and how to submit your comments, concerns and other inputs.

The map below and the table underneath it show the location of EIAs. Click/tap on any cluster marker to zoom in to that area and see details. Open the Legend accordion below to see the cluster and marker legends. Zoom and pan the map, then hover on a marker to see the title of the EIA. Tap/click on a marker to see more information. Use the Map Layers icon (top right) to switch layers on and off.

Filter the map and table:

Last date for input by interested and affected parties
ECC: Environmental Clearance
Certificate
A High - C Low.
Open accordion below for details.
Text in Project, EAP or Proponent name

Risk ratingCriteriaExamples
ASignificant impact on biodiversity, especially species of high conservation priority; High pollution risk; High risk to water resources.Large mines; Oil and gas exploration; Storage of hazardous chemicals e.g. for mining.
BMedium impact on biodiversity; Medium pollution risk; Medium risk to water resources.Mining Claims; EPLs; Storage of petroleum products; Fuel stations; Transmission powerlines.
CLow risk to biodiversity; Low pollution risk; Low risk to water resources.Urban infrastructure; Sand mining; Water supply.

The number of EIAs in an area is shown by coloured cluster markers:

xxx indicates <10 EIAs

xxx indicates 10–100 EIAs

xxx indicates >100 EIAs


The extent of an individual EIA is indicated by a shaded polygon.


Category   /   StatusEIA on holdEIA underwayECC issuedECC rejected
Agriculture
Aquaculture
Energy
Geological exploration
Industry, manufacturing
Mining
Non-urban infrastructure
Oil exploration
Sand mining
Tourism
Urban infrastructure

 


Icons from: Map Icons Collection

7 EIAs match the selected filters. See the table below the map for EIA details.

7 EIAs match the selected filters. (The numbers on the map indicate the number of sites these EIAs include; many EIAs encompass more than one location/site.)



Click/tap on any hyperlinked heading to sort the data table (ascending) by that heading; click/tap again to sort descending.
EIA # Title Category, Status & Risk rating EAP Proponent Deadline for IAP inputs
[3036]
See full details
Public Notice Environmental Impact Assessment: Layout Approval and Township Establishment on Consolidated Erf X to Become Known as Ekuku Extension 8; and Permanent Closure of Erf B of Erf 572, Ekuku Extension 1 as a Public Open Space Urban infrastructure
EIA underway
C (Low)
Jan Trading CC
[3022]
See full details
Call For Public Participation/Comments For The Environmental Scoping Assessment For The Proposed Prospecting And Exploration Activities On Exclusive Prospectives (EPLs) No. 10526; 9564;9484;9492;6563;9521;9537;9566;9478;9479;9483;9477;9480;9461;9515;9519;9462;9455;9430;9431;9565;9538;9520;9514 AND 9513 Mining
EIA underway
B (Medium)
Neo Global Minerals Namibia (Pty) Ltd
[2980]
See full details
Hotel Development, On Erf 1333 (Portion Of Erf No. 406) Tourism
EIA underway
C (Low)
Fabrikant Construction & Manufacturing Cc
[3031]
See full details
Public Notice Town Planning And Environmental Impact Assessment: Rezoning Of Erf 271, Lüderitz From "Residential II" With A Density Of 1:150 To "General Business" With A Bulk Of 2.0 Urban infrastructure
EIA underway
C (Low)
Monica Kratz
[3034]
See full details
Public Notice for Application of New Environmental Clearance Certificate for the Prospecting of Base and Rare Metals, Precious Metals,industrial minerals and Dimension Stone within EPL 9578 Geological exploration
EIA underway
A (High)
Calculus Commodities (Pty) Ltd
[3027]
See full details
Town Planning And Environmental Impact Assessment: Subdivision of the Farm Arandis Townlands No. 170 into Portion A and the Remainder, and Rezoning of Portion A from "Undetermined" to "Local Authority" for a Landfill Site Urban infrastructure
EIA underway
C (Low)
Arandis Town Council
[3026]
See full details
Public Notice Town Planning And Environmental Impact Assessment: Rezoning, Subdivision, and Reservation from "General Residential" to "Residential" (density 1:300), subdivision into 78 erven and the Remainder, rezoning/reservation of the Remainder to "Street", rezoning of new Erven 77/1001 and 78/1001 to "Public Open Space", and inclusion in the next Omuthiya Zoning Scheme to create 76 additional residential erven for lower-income earners. Urban infrastructure
EIA underway
C (Low)
Omuthiya Town Council